Level 3 Water Restriction
 

Pre-Qualified Contractors (Beaver Mines Project)

The Municipal District of Pincher Creek (MD) is opening a pre-qualification process to develop a list of pre-authorized contractors for private property owners in the Hamlet of Beaver Mines undertaking the installation of private property Water and Wastewater Lot Servicing.
 
The intent of this pre-qualification process is to develop a list of pre-authorized contractors (general, plumbers, etc.) whom have read and understood the Utility Services Guidelines; which outline the procedures and requirements to be followed when connecting to the Municipal systems) and have the qualifications required to install private water and drainage lines. The MD will maintain a list of these pre-qualified contractors on our website and provide these lists directly to the residents of Beaver Mines.
 
There are 60-70 Water and Wastewater Private Service Connections required in Beaver Mines, connection to municipal systems is mandatory within the next 4 years. It is household and commercial property owner’s responsibility to hire contractor(s) to design and construct the service connections on their property keeping in view specific requirements of the property and surface/subsurface constraints of the lot. Owners may use their own contractors, but have been recommended to use MD pre-qualified contractors.
 
Major work items for on-property work will include:

 
Other expected work items may include (but are not limited to):
 
For more information regarding the application process, please refer to the MD website at https://mdpinchercreek.ab.ca/content.php?p=732 for the documentation and forms.
 
Note that the MD reserves the right to accept any number of pre-qualifications that it deems most advantageous and also the right to reject any or all submissions which, in the opinion of the MD, are incomplete, obscure, irregular, non compliant with the terms of the pre-qualification document, an obvious conflict of interest, or found to contain non-disclosures of such and/or other pertinent details. The MD is under no obligation to pre-qualify any Contractor, and reserves the right to terminate the pre-qualification process at any time, and to withdraw from discussions with any or all of the Contractors who have responded. Currently, a deadline has not been implemented to submit a pre-qualification submission.

The MD will begin accepting submissions June 1st, 2023. Currently, the MD is anticipating acceptance of flow sometime between September 1st, 2023 and October 15th, 2023. We anticipate providing tighter dates in subsequent updates. Please note that contractors must not connect to the curbstops and stubbed sewer connection until the treatment system is able to take flows. The MD will issue the exact date when it is ready to allow final connection to the system. Contractors MUST NOT connect before this date.
 
Any contractor that desires to perform work related to Beaver Mines Lot Servicing on private property is free to do so, provided the requirements of Bylaw 1344-22 and the Utility Services Guidelines are met.

Return to News & Events

Municipal District of Pincher Creek No. 9
Box 279
1037 Herron Avenue, Pincher Creek, AB T0K 1W0
Phone: 403-627-3130       Fax: 403-627-5070
Email: info@mdpinchercreek.ab.ca
Office Hours: 8:00am - 4:30pm M-F

Municipal District of Pincher Creek No. 9
Box 279
1037 Herron Avenue
Pincher Creek, AB T0K 1W0
Phone: 403-627-3130
Fax: 403-627-5070
Email: info@mdpinchercreek.ab.ca
Office Hours: 8:00am - 4:30pm M-F
Copyright © 2024 MD of Pincher Creek No. 9       Disclaimer